Category: Construction Management

Housing as a Verb: The Sense In Building Slowly.

By definition, a verb is an action word. It brings the sense of unfolding series of steps. I would like to borrow this language and relate it to housing.
All the conversation around home ownership has primarily been around buying a fixed product. A House (A Noun). With no action expected on the part of the home owner apart from signing that mortgage agreement or cheque. This top-down authoritarian approach to housing ignores a major player in the equation, the user.
Intellectual Basis: The Freedom to Build
Most buildings cannot be occupied until they are finished. In real life, occupation certificate cannot be issued until the whole building has achieved Practical Completion. However, the question then to ask is, “What is “Completion?”, Can Practical Completion be Achieved In Stages?”

518gfvtmuml-_sx334_bo1204203200_“If housing is treated as a verbal entity, rather than a manufactured and packaged product (noun), decision-making power must, of necessity, remain in the hands of the users themselves.
The ideal we should strive for is a model which conceives housing as an activity in which the users-as a matter of economic, social, and psychological Common Sense-are the principal actors.  This is not to say that every family should build its own house, as the urban squatters do, but rather that households should be free to choose their own housing, to build or direct its construction if they wish, and to use or manage it in their own ways.” – Freedom to Build, John F C Turner & Robert Fitchter (1972)

 

Self-build and The Law
What does the law say about self-build? Is Owner-Building prohibited by the Law? Surprisingly, the answer is partly Yes and No. The National Construction Authority Act 2011 provides in Section 16:

“a person shall not be deemed to be a contractor if the work undertaken— (i) does not incur a cost exceeding such sum or sums as the Board may from time to time determine; or (ii) consists of a residential house for private use, not requiring a structural design.” – See more here.

 

• How many people can afford a Building Contractor?
• How many people can afford to buy a ready built house (ready to occupy)?
• Most importantly, how many people can afford a housing mortgage today?  According to a 2015 survey by Kenya Bankers Association, those who could afford a mortgage in Kenya are only 2.4% of the population.
For a majority of the population, Assisted Self-Build(ASB) (Also called Do-It-Yourself) is the only viable option out if the dream of Home Ownership is to become a reality. In this regard, Building Slowly is the Common Sense Solution!

The Reality
Admit it! Most people don’t have to have all the money to build their own “dream” house. And this is perfectly OK if you understand where to put the brakes and how to proceed to completion.
Nobody ever has enough of everything on short notice. That is why humanity has embraced the concept of growth. Countries aspire to be developed or middle-income after certain number of years. They tell us, “Rome was not built in a day,” but seldom do we hear stories of victory by ordinary people building their life one step at a time. We are inundated with messages of “Utahama Lini” as if housing is an emergency. It is not unless it is!
Real Life Example: Application of Build Slowly
In February 2010, a magnitude 8.8 earthquake hit Chile, killing approximately 500 people and destroying 80% of the buildings in the town of Constitución.

137009-004-510fc42a

 

An award winning firm of Architects called Elemental reconstructed the homes named, “Villa Verde”, housing complex with more than 480 sustainable homes for the victims of the earthquake.

According to 99% Invisible, As part of the relief effort, an architecture firm called Elemental was hired to create a master plan for the city, which included new housing for people displaced in the disaster. Elemental built for the people Half-a-House with one half of the house ready to be moved in and the other half, just a frame with an empty space ready to be built up when the owner grows wealthy.

Incremental Building: Villa Verde by Elemental, Chile

Incremental Building: Villa Verde by Elemental, Chile

This is exactly the idea of a House as a Verb!

As you prosper, then you can have Add-Ons to the initial fabric or structure of the house. In this case, the house is never seen as a complete project but an unfolding expression of the ways, means and creativity of the owner.

If we can start looking at housing from this perspective, all the pressure that one must build NOW and Occupy the Entire House immediately, evaporates.
The technical term for this is called Site and Services Schemes or Incremental Building.
Advantages of Incremental Building:

  • Improvement and Modernisation of the units can be done at a later stage.
  • The fabric of the house can evolve to reflect the achievements of the owner.
  • As the expert, the Design-Build contractor can transform into providing affordable housing solutions or a series of Packaged Deals which any would-be home owner can pick and assemble incrementally with Add Ons as their fortunes improve. This is housing as it should be.

Are we looking at a New Opportunity of User-Controlled Housing?
Does it have potential to become the new vehicle of personal, family and social growth?

If we think of Housing as a Verb, we allow the People to Shape their Destiny. This way, we can build a better future together. …..to be Continued.

Affordable Housing Solutions for First Time Home Owners.

Ujenzibora Seeks to provide a series of bespoke housing solutions that are highly customizable, affordable and technologically sound for first time home owners. We offer our clients a one stop hustle free Lab where they can come and find lasting solutions and achieve their goals. We have already designed and built some of the concept houses for example The Firstep House, The Minima, The Open Place et Cetera. We are available to build more.

Our Design and Build package offer our clients a one-stop-shop, peace of mind and affordable solutions in home ownership.

We like challenges and there is no limit as to what projects we can undertake in the built environment. We look forward to working on a variety of challenges and build magnificent houses.

We undertake:

  • Residential Projects,
  • Interior Design and Remodeling,
  • Commercial Projects like office blocks and
  • Eco-Tourism Developments.
  • Proposed Hotel Development Design & Built by Ujenzibora

    Proposed Hotel Development Design & Built by Ujenzibora

  • Customized Container Housing for Office, Residential or Commercial Use.
Interior of The Loft House.

Interior of The Loft House.

We are available to work on projects all over the republic. We believe we have the right team and housing solutions for our clients. – Qs.David Nahinga

 

10 Practical Ideas To Lower Building Cost Without Cutting Corners

httpss://twitter.com/UjenziBora/status/820971727849160705

It is always better to keep the building project within your financial expectations without compromising its integrity. This article is not about building a “cheap building” but Management of Costs irrespective of the size or budget of the project.

The beauty of managing costs is that resources are not wasted and whatever is left can be used on other aspects of the building like landscaping or enhanced security.

1.0 “Manage the project within a Construction Process”

In building a house, there is a messy process and there is the right process of doing things. The easiest way to have cost-overruns is to be dis-orderly.
Management creates order in the building process. The right process helps one to:

Control the Risks.
Control the Design.
Control the Labour Costs.
Control the Overheads.

You will have an upper hand if you have the benefit of foresight, planning and management. You require a program of works and a Method Statement for the Project. This will save you time and money.  Don’t just build as if you are cooking “fufu”.

Have a plan and a process in place before starting the building project.

2.0 “Optimize your building site”

You need to plan the house with a clear view of site conditions. Don’t “copy paste” designs from one site to another even if the user needs are the same.
Simply, cut your coat according to your cloth:

i)If you don’t have much level ground, design a house with a small footprint (ground cover).

ii)If your site is sloped, consider doing a basement instead of spending money on cut and fill.

3.0 “Story buildings are relatively cheaper”

Suppose you have a 1500 square meter house all spread out on the ground and a three story house with each floor covering 500 square meter , which one gives you more value for money?

i) Roof Cover- In our example, for the same amount of floor area you spend less on roof covering.

ii)Foundation Costs – In our example, for the same amount of floor area you spend less of foundation costs and ground preparation.

iii)Savings on land are realized by building vertically.

Clearly, stacking saves one money when building. However, this option is limited by the zoning laws and regulations of the City Council or County/Municipal Council.

4.0 “Simplify the Design”

Leornado Da Vinci is quoted as saying, “simplicity is the ultimate form of sophistication.”

Yes! Take more time in the design stage of the construction.  Be realistic and practical when drafting the Design Brief. A more complex design will cost more.

A complex roof-line with excess ridges and valleys will add to the time and cost of construction.

Let form follow function. Think about the maintenance cost of every material forming the fabric of the house.

Remember, for every building fitting or material, there is an alternative maintenance free material.  Cheap is expensive, therefore Buy Quality to minimize cost-in-use.

To reduce on the building cost, you can avoid curved rooms, curved walling and overly sophisticated designs without compromising on the aesthetics.

5.0 “Consider Open Floor Plans”

You do not necessarily need a solid wall separating the kitchen, the dining and the lounge. You can partition using half a wall. You can also opt to have an open plan between the three spaces (Lounge, Dining and Kitchen). Do a comparative cost-analysis of various options including making the lounge sunken to “define it.”

6.0 “Minimize Administrative Costs”

Have an on-site project office, a clerk of works and a store keeper to handle records as to building materials. Record management will help in minimizing waste, theft and anticipating periods for re-ordering materials or labour.

7.0 “Manage the procurement Process”

A crafty contractor may maximize profits by under-quoting on labour but offloading his profit ambition on procurement of materials.
Where do you source the materials and fittings?
Is it done competitively?
What are the alternatives?
You can save much by pre-ordering fittings and fixtures.
Have you considered imports for bulk supplies?
Consider that you can obtain a superior fitting.In case of large capital investments, one can have considerable quantity discounts by buying in bulk from the source, eliminating middlemen.

8.0 “Look at the House As An Extension of Yourself”

The best way to do this is to outline your role and key functions.  Consider multi-use spaces and utilizing and creating space that would ordinarily not be in the normal houses. You will more enthusiastic about your house only if it reflects your aspirations. It is not ab-normal to have a house without a typical lounge or bedroom. Form follows function. Most people incur unnecessary costs building a house “like that of their neighbor.” For example, if you don’t like visitors, there is no point building a guest house if you are straining your budget! Let that money go into a spacious lounge or more elegant finishes.

9.0 “Do not Ignore Insurance”

The only way to mitigate certain risks is by Insurance of the works, workers and materials. Obtain a Contractor All Risk(CAR) Policy for the duration of works. Construction insurance provides safeguards for you as an employer against your construction workers being injured on site. Construction insurance does not exempt you from maintaining a safe workplace.

10.0 “Have a Contingency Plan”

This is money set aside for “unforeseen circumstances” which may eventually sink the building project if not taken care of. Also, have in place rules t spend the contingency fund. They include things like:

i) Inclement weather.

ii) Foundation issues

iii) Cost overruns from extended preliminaries, making changes, and encountering unforeseen design problems.

iv) Inflation and adverse Market conditions

SUMMARY:

How To Lower Building Cost